Search:
Figure 1: Shows an image after the initial wash done in 2009 & a photo taken 10 years later in 2019.
Figure 1: Shows an image after the initial wash done in 2009 & a photo taken 10 years later in 2019.
Figure 2: An Image taken in 2019 after 10 years of wear & tear and the FirmeCrete Wall Coating still looks great!!!
Figure 2: An Image taken in 2019 after 10 years of wear & tear and the FirmeCrete Wall Coating still looks great!!!
Figure 3: Up close image taken 10 years late. Look at the texture consistency between the precast window sill and the FirmeCrete Wall Coating. The Coating matches the texture consistency of a formed and casted precast window sill even though FirmeCreteWall Coating is hand applied.
Figure 3: Up close image taken 10 years late. Look at the texture consistency between the precast window sill and the FirmeCrete Wall Coating. The Coating matches the texture consistency of a formed and casted precast window sill even though FirmeCreteWall Coating is hand applied.

CSULB Peterson Hall

Applied a custom blended FirmeCrete Wall Coating to match the existing Mesa Buff pour in place sandblasted concrete walls.

The original casted walls had an inconsistent color due to batching issues at the ready-mix plant and cold joints created slow delivery of the concrete during the pouring process.

The original walls had air & rock pockets which were scratched in prior to applying the FirmeCrete Wall Coating. The Coating was applied by Cano Architecture Concrete Repair for Bomel Construction. The Project was completed in 2009.

Project:

California State University of Long Beach Peterson Hall- 1250 Bellflower Blvd, Long Beach, Ca 90840

Year:

2009

Category:

Exterior