Search:
Figure 1: After The Initial Wash of the FirmeCrete Wall Coating on the Seat Wall and Bench
Figure 1: After The Initial Wash of the FirmeCrete Wall Coating on the Seat Wall and Bench
Figure 2: After image of the FirmeCrete Floor Coating on the Top Patio Landing.
Figure 2: After image of the FirmeCrete Floor Coating on the Top Patio Landing.
Figure 3: Shows the after of the FirmeCrete Mix # 141 on the top patio, bench wall, & the steps. The bottom patio is the original existing concrete done by others and does NOT have a FirmeCrete Coating.
Figure 3: Shows the after of the FirmeCrete Mix # 141 on the top patio, bench wall, & the steps. The bottom patio is the original existing concrete done by others and does NOT have a FirmeCrete Coating.

Malibu Mariposa De Oro

FirmeCrete Wall & Floor Coatings were applied to the existing top patio landing and the top patio bench. The original concrete contractor had issues getting a consistent texture and finish due to the long-haul time of the ready-mix concrete.

This occurs often in the rural areas of Malibu, it takes so long for the ready mix to arrive due to traffic and long routes.

At this project by the time the concrete arrived on site the concrete was already beginning to set or what is known in the industry as a “hot load”. This project was completed in 2021 by Cano Architecture Concrete Repair.

Mix Utilized:
  • FirmeCrete Floor & Wall Coating Mix # 141 with a Top Cast #03 Finish

Project:

Private Residence Mariposa De Oro Malibu, Ca 90265

Year:

2021

Category:

Exterior