1875 Century Park East Los Angeles, Ca 90067 – FirmeCrete Floor Coating – Black Silicon Carbide FimeCrete Floor Coating was installed at the parking Entrance. FirmeCrete Floor Coating was installed +/-1/8” thick over shot-blasted existing post tension cable parking structure concrete deck.
This Firmecrete Floor Coating parking is driven over by 1,200+ vehicles per day & 600+ on weekends. (Vehicle numbers are based on the pre-covid-19 average provided to us by ABM Parking services).
Project was poured in 3 mobilizations, the only preparation done to the sub floor was shot blasting. Existing slope issues or elevation issues were left untouched. Project was Completed in September of 2017.