Search:
Figure 1: FirmeCrete FoamCast being poured 1/4" thick over  1" thick custom cut Styrofoam
Figure 1: FirmeCrete FoamCast being poured 1/4" thick over 1" thick custom cut Styrofoam
Figure 2: FirmeCrete FoamCast After Final Wash
Figure 2: FirmeCrete FoamCast After Final Wash
Figure 3: FirmeCreteFoamCast Installed on South Elevation Archway at the Wilshire Temple
Figure 3: FirmeCreteFoamCast Installed on South Elevation Archway at the Wilshire Temple
Figure 4: FirmeCreteFoamCast North Archway installed at the Wilshire Temple
Figure 4: FirmeCreteFoamCast North Archway installed at the Wilshire Temple

Wilshire Boulevard Temple

FirmeCrete Foamcast – 38 FirmeCrete Foamcast arch panels where poured and installed on the North & South elevation archways. The FirmeCrete Foamcast was installed on the New Wilshire Boulevard Temple. The 100% exposed aggregate FirmeCrete Foamcast was poured +/- ¼” thick on top of 1” thick Styrofoam.

FirmeCrete Wall Coating was custom blended to match the adjacent GFRC panels (GFRC was poured by others). The Styrofoam was custom cut on-site to match the existing archway radius.

Foam cutting was provided by Performance Contracting Inc. FirmeCrete Foamcast Wall Coating was formed, poured, and finished by Cano Architecture Concrete Repair.

Firmecrete was Installed by Performance Contracting Inc. Project was completed in July 2021.

Project:

Wilshire Boulevard Temple 3663 Wilshire Blvd, Los Angeles, Ca 90010

Year:

2021

Category:

Exterior